Horncastle, Lincs and London

Earn up to 28p for every unit of electricity you produce - even if that electricity is used!
See the feed-in-tariff page for details

Starting manufacture in 1984 in Western Australia, Westwind turbines are now made in Northern Ireland by J A Graham Energy Services.

The following estimates are for sites based within the UK. Cost estimate includes delivery and installation, but excludes any foundation work that may need to be carried out.

Wind Turbine System

From

 

 

Westwind 10kW grid connected

£40000

 

 

Westwind 20kW grid connected

£69000

NOTES
Grid Connect Systems - budget costs all assume a cable length of 100m max

Tower upgrades are: 10kW from 15 to 18m  20kW from 15 to 18m

Exact delivery costs may vary.
Budget costs are all EX VAT
Budget costs do not include foundation works
.

Indicative only

MCS 1113
 Micro and Small Wind systems

[Green Generation] [Evance R9000] [Endurance E-3120] [Gaia 133 11kW] [Proven P35-2] [Westwind] [Feed-in-Tariffs] [Timeline] [Hints and Tips] [Selling Power] [Alternatives] [Links] [Contact]