Horncastle, Lincs

Earn up to 26.7p for every unit of electricity you produce - even if that electricity is used!

The following estimates are for sites based within the UK.
Cost estimate includes delivery and installation, but excludes any foundation work.

Wind Turbine System

From

Tower upgrade

Proven 3.2 Grid Connected

£18000

£1550

Proven 3.2 Battery Charging

£23000

£1550

 

 

 

Proven 6 Grid Connected

£24000

£3700

Proven 6 Battery Charging

£32000

£2700

 

 

 

Proven 15 Grid Connected

£55000

POA

Proven 15 Battery Charging

£57000

POA

NOTES
Grid Connect Systems - budget costs all assume a cable length of 100m max
Battery Systems - budget costs all assume a cable length of 40m max
Tower upgrades are:
2.5kW from 6.5 to11m
6kW from 9 to 15m
15kW from 15 to 20m

Exact delivery costs may vary.
Budget costs are all EX VAT
Budget costs do not include foundation works
.

THESE FIGURES ARE FOR A ROUGH ESTIMATE ONLY AND SHOULD NOT BE USED IN ANY GRANT APPLICATION, OR OTHER SIMILAR FORMAL DOCUMENT. PLEASE CONTACT
GREEN GENERATION LTD FOR A FULL QUOTATION PRIOR TO PLACING AN ORDER AS FINAL COSTS MAY VARY DUE TO SPECIFIC SITE CIRCUMSTANCES.
 

 

[Green Generation] [Ampair] [Gaia] [Proven] [Pricing] [Skystream] [Westwind] [As an investment] [Hints and Tips] [Selling Power] [Alternatives] [EW 15/50] [Links] [Contact]